ProjectGlobalCannotBeDeleted = 101 Cannot delete the enterprise global template. When I create a new project, I can perfectly save it, but when publishing the project, it gets stuck on 94% and returns an error 23000(0x59D8). ProjectOptCurrencyPositionInvalid = 1036 The optional currency position is not valid. CustomFieldCannotModifyDepartmentUidOnBuiltinFields = 11732 The department GUID cannot be modified on built-in custom fields. More about the author

ProjectNameInvalid = 1016 Project name is not valid. Archive web service error codes Archive (backup and restore) error code Description ArchiveProjectFailure = 25000 The project archive operation failed. ProjectExceededItemsLimit = 1054 Exceeded the limit of items to process. CustomFieldCodeValueDoesNotMatchLookupTable = 11706 The code value does not match the lookup table. https://msdn.microsoft.com/en-us/library/office/ms508961.aspx

Project Server 2010 Error Codes

PlannerInvalidSolutionForConstraint = 28113 The Planner solution is not valid for the constraint. About Me PJ Mistry Hi, I am a Microsoft Certified EPM & SharePoint Consultant and Trainer (MCP, MCT, MCTS, MCITP), working for Project Solution Ltd, with over 12 years field experience ProjectAlreadyExists = 1001 Project already exists.

The errors returned from the queue are as follows: Error ID: 16400 Error ID: 26000 Detailed error below - send it to the administrator for more detailed troubleshooting. Active Directory synchronization error codes Active Directory synchronization error code Description AdSyncUpdateTimerJobFailed = 27002 The update timer job failed for synchronization with Active Directory directory services. LookupTableItemContainsSeparator = 11051 The lookup table item contains a separator character. ProjectCheckedout = 1007 Project checked out.

Issue with both default and custom templates. Generalqueuejobfailed (26000) AdminViewDataWasTampered = 16602 The data has been altered. The limit is NEW_CF_PER_REQUEST_LIMIT in one request.CustomFieldNameIsReservedName = 11722A custom field name cannot be a reserved name.CustomFieldNameInvalidForOlapMeasure = 11723The custom field name is invalid for an OLAP cube measure.CustomFieldNameInvalidForOlapDimension = 11724The https://social.technet.microsoft.com/Forums/projectserver/en-US/1bb938bc-267e-44a6-9922-9ca5dd02b968/new-projects-stuck-at-94-when-publishing-error-230000x59d8?forum=projserv2010setup Again a support call probably needed.

AdSyncAdConnectFail = 27006 Cannot connect with Active Directory. OptimizerInvalidConstraintValue = 29719 The constraint value is not valid. ProjectFilterInvalid = 1043 The project filter is not valid. The content you requested has been removed.

  • I have tried setting the Publish field in the schedule to "No" for all tasks and then published to no avail.
  • LookupTableMaskSequenceTypeInvalid = 11004 The code mask sequence type is not valid.
  • AdminUnableToMerge = 20003 Unable to merge the data.
  • RestoreSystemSettingsFailed = 25011 Cannot restore the system settings.
  • CustomFieldCannotHaveBothFormulaAndMultilineText = 11734 A custom field cannot include both a formula and multiline text.
  • Why do jet engines smoke?

Generalqueuejobfailed (26000)

PlannerInvalidProjectFNLTDate = 28203 The "finish no later than" date for the project is not valid. Watch jobs back up behind it, in hopes it’ll finish soon! Project Server 2010 Error Codes Active Directory synchronization error codesActive Directory synchronization error codeDescriptionAdSyncUpdateTimerJobFailed = 27002The update timer job failed for synchronization with Active Directory directory services.AdSyncDeleteTimerJobFailed = 27003The delete timer job failed for synchronization with Project Server 2013 Rest Api AdminNTAccountNotFound = 19032 The Windows (NTLM) account is not found.

OptimizerDepDuplicateDependentProjects = 29004 There are duplicate projects in the OptimizerDependencyDataSet.OptimizerDependencyDetailsDataTable. http://spamdestructor.com/project-server/project-server-error-id-26000.php Specifically, some selected users may have 5 tasks…these 5 tasks appear, followed by another headingg and then the same 5 tasks appearing a second time. With Kind Regards, Robin Kruithof Technical Consultant EPM Proposed as answer by JGabo Monday, September 19, 2016 5:42 PM Wednesday, August 07, 2013 7:15 AM Reply | Quote 0 Sign in Thanks Matt Reply Follow UsPopular TagsProject Server 2007 Project Server 2010 Project Server 2013 Project Online Project 2013 Cumulative Update Project 2010 psvr2007 Analysis Services psvr2010 Project Server 2007 PSI SP2

PlannerInvalidProjectStartDate = 28200 The project start date is not valid. If you can't find the UID in the Reporting database, take a look at Draft and/or Published. GeneralWorkInvalid = 71 A work parameter is not valid. http://spamdestructor.com/project-server/project-server-2007-error-code-26000.php OptimizerDuplicateForceLookupTableUids = 29693 There are duplicate forced lookup table GUIDs.

PlannerInvalidAnalysisType = 28015 The type of portfolio analysis is not valid. Dev Center Explore Why Office? OptimizerProjectSelectorAtLeastOne = 29800 There must be at least one project selected for the Optimizer.

In my case it was OpenInClient.

AdminViewInvalidDividerPosition = 16601 The divider position is not valid. ProjectResourceNotFound = 1100 Resource not found. OptimizerCannotCalculateProjectPriorities = 29610 The Optimizer cannot calculate project priorities. OptimizerInvalidPrioritizationType = 29601 The prioritization type for the Optimizer is not valid.

PlannerInvalidOptimizerSolutionUid = 28101 The Optimizer solution GUID is not valid. CustomFieldInvalidAggregationType = 11531 The aggregation type is not valid. LookupTableMaskSeparatorInvalid = 11008 A code mask separator character is not valid. http://spamdestructor.com/project-server/project-server-error-26000.php Interesting - this looks like it goes to WSS help maybe because it is inherited from the base WSS site, so it doesn't find any Project Server topics.

ProjectInvalidOwner = 1056 The project owner is not valid. OptimizerSolutionCreateMessageFailed = 29711 The Optimizer failed to make a "solution created" message. GeneralDatasetConstraints = 26025 Error in DataSet constraints. ProjectParametersInvalid = 1004 One or more project parameters are not valid.

Planner error codes (project portfolio analysis) Planner error code Description PlannerSolutionMessageDeleteFailed = 28000 Queue error: the message to delete the planner solution failed. Table 9. If you did, remove all assigned resources from summary tasks and sava as project. CBSASServerLockTimeOut = 17006 The Analysis Services server lock timed out.

Powered by Blogger. PlannerInvalidForceLookupTableValue = 28923 The forced value of a lookup table is not valid. ActiveCacheUnsupportedProjectProfessionalVersion = 12015 The Project Professional version is unsupported. RestoreResourcesFailure = 25030 Cannot restore the resources from the archive.

Cancel the job. ProjectOptCurrencyCodeInvalid = 1046 The currency code is not valid in the project options. CustomFieldMaxValuesExceeded = 11712 Maximum custom field values exceeded. CalendarNameShouldNotBeNull = 13023 The calendar name is null.